Commercial Geothermal Projects Underway

Edmond Hilton Garden Inn and Conference Center (Edmond, OK):

  • 160 room 6-floor hotel with 26,000 sq. ft. conference center, new construction
  • Conference center: 138 tons geothermal, 13 units, 72 – 500 ft. vertical bores
  • HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
  • Hotel: PTAC /VTAC heat pumps, gas-electric RTUs, split-system heat pumps, 10 tons geo pool heat
  • Energy Recovery Ventilators (ERVs) and DOAS RTUs

Offices at Market Center -Building 3 (Oklahoma City):

  • 66,000 sq. ft. office building, 2-floor, new construction
  • 175 tons, 60 units, 96 – 500 ft. vertical bores
  • HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
  • Energy Recovery Ventilators (ERVs)
  • Internet-based energy management system

Washington School Classroom Building (Washington, OK):

  • 11,000 sq. ft. classroom building, new construction
  • 33 tons, 10 units, 22 – 500 ft. vertical bores
  • HDPE two-pipe hydronic piping, variable speed central pumping
  • Energy Recovery Ventilator (ERV)

Garrett and Company HQ (Oklahoma City):

  • 14,000 sq. ft. office building, 2-floor, renovation
  • 39 tons, 16 units, 20 – 500 ft. vertical bores
  • HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
  • Energy Recovery Ventilator (ERV)
  • Internet-based energy management system

Corn Bible Academy (Corn, OK):

  • 46,000 sq. ft. mixed-use education building, new construction
  • 160 tons, 18 units, 96 – 450 ft. vertical bores
  • HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
  • Energy Recovery Ventilator (ERV)
  • Internet-based energy management system

The Hill – Town Hall (Oklahoma City):

  • 5,000 sq. ft. community center, 1-floor, new construction
  • 16 tons, 4 units, 5 tons geo pool heat, 5 tons geo spa heat, 8 – 500 ft. vertical bores
  • HDPE two-pipe hydronic piping, variable speed parallel independent pumping

Climb Up Climbing Gym (Oklahoma City):

  • Repurposed turn of century grain silo complex, retrofit
  • 30 tons, 5 units, 12 – 500 ft. vertical bores
  • HDPE two-pipe hydronic piping, variable speed parallel independent pumping

Grain Elevator (Oklahoma City):

  • 11,000 sq. ft. office building, 4-floor, repurposed grain elevator
  • 24 tons, 9 units, 16 – 500 ft. vertical bores
  • HDPE two-pipe hydronic piping, variable speed parallel independent pumping
  • Energy Recovery Ventilators (ERVs)
  • Internet-based energy management system