- 40,000 sq. ft. office and 70,000 sq. ft. manufacturing, 2-floor, new construction circa 2012
- 120 tons office AC, 70 tons plant heat, 37 units
- 72 – 400 ft. vertical bores with future expansion via retention pond heat exchanger
- Energy recovery from irrigation system
- HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
- Energy Recovery Ventilators (ERVs)
- Electronic night setback and ERV scheduling