Crescent Directional Drilling (Oklahoma City)

  • 8,000 sq. ft. office and 15,000 sq. ft. shop, 1-floor, new construction circa 2013
  • 23 tons office AC, 20 tons shop heat, 11 units, 12 – 425 ft. vertical bores
  • HDPE single-pipe hydronic piping, variable speed primary-secondary pumping
  • Energy Recovery Ventilator (ERV)
  • Electronic night setback and ERV scheduling